# @orioles on Instagram

- **Type:** Image
- **Original URL:** https://www.instagram.com/p/Bkkj5SAHfi4
- **Gondola URL:** https://gondola.cc/posts/14966393-orioles-instagram
- **Thumbnail:** https://img.gondola.cc/tr:w-,h-,fo-auto/thumbnails/ec28032c38.jpg
- **Posted:** 2018-06-28T14:12:45.000+00:00
- **Account Owner:** Baltimore Orioles (@Orioles) — https://gondola.cc/Orioles

## Caption

#OsThrowback to this date in 1989: Construction on Oriole Park begins with the razing of the structures on the 85-acre lot at Camden Yards. The ballpark will take 33 months to complete. #Birdland #OPACY

## Stats

- **Views:** 0
- **Likes:** 3,678
- **Shares:** 0
- **Comments:** 25

## Tags

opacy, birdland, osthrowback

---
Copyright (c) Gondola