# @constructivedesigngroup on Instagram

- **Type:** Video
- **Original URL:** https://www.instagram.com/p/C9ZllNmRUk_
- **Gondola URL:** https://gondola.cc/posts/20610019-constructivedesigngroup-instagram
- **Thumbnail:** https://img.gondola.cc/tr:w-,h-,fo-auto/thumbnails/a14e88c91a.jpg
- **Posted:** 2024-07-14T10:31:04.000+00:00
- **Account Owner:** Raleigh Outdoor Design | Bryan Perry (@constructivedesigngroup) — https://gondola.cc/constructivedesigngroup

## Caption

How long does it take to set a fiberglass pool? Swimming pool excavation takes us 1 day.  Day 2 we set the base and day 3 we set the pool.  On day 4 we do the plumbing. Typically we can have the pool portion finished in 5 days! #poolbuilder #fiberglasspools

## Stats

- **Views:** 259
- **Likes:** 28
- **Shares:** 0
- **Comments:** 0

## Tags

poolbuilder, fiberglasspools

---
Copyright (c) Gondola