# @cgtneurope on Instagram

- **Type:** Video
- **Original URL:** https://www.instagram.com/p/DPzBimYDXG-
- **Gondola URL:** https://gondola.cc/posts/35690544-cgtneurope-instagram
- **Thumbnail:** https://img.gondola.cc/tr:w-,h-,fo-auto/postThumbnails/d3fc679cd0.jpg
- **Posted:** 2025-10-14T17:00:56.000+00:00
- **Account Owner:** CGTN Europe (@cgtneurope) — https://gondola.cc/cgtneurope

## Caption

Yebatan Hydropower Station, located on upper Jinsha River in southwest China has started filling its reservoir, entering the final stage before its first power-generating units go online.⁣
⁣
The station has a total installed capacity of 2,240 MW, with a maximum dam height of 217 meters. ⁣
⁣
Once fully operational, the Station will generate over 10.2 billion kWh of electricity annually, equivalent to saving nearly 4 million tons of standard coal and reducing carbon dioxide emissions by around 7.37 million tons each year.⁣
⁣
Construction of the hydropower station's main structure began in September 2018 and the full operation is scheduled for 2026.⁣
⁣
#carbonredux #cleanenergy #carbonfootprint #greenenergy

## Stats

- **Views:** 8,102
- **Likes:** 480
- **Shares:** 0
- **Comments:** 8

## Tags

cleanenergy, carbonfootprint, greenenergy, carbonredux

---
Copyright (c) Gondola