## Caption

Bathroom before and afters make remodels look like they happen in the blink of an eye, but here’s how long it really takes to get a single bathroom redone:

 - Estimating: 2-3 weeks
 - Lead times: 1 to 6 months, exact timing varies based on selections
 - Construction: 1-4 months (depends on the project of course!)
 - Expect at least 3 months between the start of the conversation and when construction could actually begin
 - This timeline assumes an interior design or architect has already put together drawings for your vision

If you want to remodel a bathroom, get the conversation with a builder started early on. The earlier you reach out the easier it is to reserve your project on everyone’s calendar!

Bathroom design: hayleymaureendesign 
Photography: rymcdon 

#bathroomremodel #bathroomdesign #bathroombeforeandafter #beforeandafter #remodeling #remodelingtips #chicagobuilder #chicagoremodeler

## Stats

- **Views:** 0
- **Likes:** 44
- **Shares:** 0
- **Comments:** 1

## Tags

beforeandafter, remodeling, chicagoremodeler, bathroomdesign, remodelingtips, bathroomremodel, chicagobuilder, bathroombeforeandafter

---
Copyright (c) Gondola