# @downinnadesert on Instagram

- **Type:** Image
- **Original URL:** https://www.instagram.com/p/DYAzbXQkr7i
- **Gondola URL:** https://gondola.cc/posts/65216918-downinnadesert-instagram
- **Thumbnail:** https://img.gondola.cc/tr:w-,h-,fo-auto/postThumbnails/b72d4d3137.jpg
- **Posted:** 2026-05-06T21:37:32.000+00:00
- **Account Owner:** Down In The Desert🌵 (@downinnadesert) — https://gondola.cc/downinnadesert

## Caption

After years of construction, ADOT says the massive I-10 widening project between Ina and Ruthrauff in Tucson is nearly complete 👀

The project will:
• Expand I-10 from 3 lanes to 4 lanes each direction

• Rebuild multiple interchanges
• Replace 9 bridges across the corridor
• Improve traffic flow + safety

ADOT says crews are finishing final details now, with the freeway expected to fully reopen by mid-May.

Tucson drivers are about to experience what it feels like to drive without hitting construction every 2 minutes 😭

Via ADOT

#Arizona #Tucson #I10 #Traffic #Construction

## Stats

- **Views:** 0
- **Likes:** 3,014
- **Shares:** 0
- **Comments:** 110

## Tags

construction, tucson, arizona, traffic, i10

---
Copyright (c) Gondola