# @20vchq on Instagram

- **Type:** Video
- **Original URL:** https://www.instagram.com/p/DaPN0UogDOQ
- **Gondola URL:** https://gondola.cc/posts/67483520-20vchq-instagram
- **Thumbnail:** https://img.gondola.cc/tr:w-,h-,fo-auto/postThumbnails/3be9414ce2.jpg
- **Posted:** 2026-07-01T05:03:09.000+00:00
- **Account Owner:** 20VC with Harry Stebbings (@20vc) — https://gondola.cc/20vc

## Caption

Comment "Watch" for the full episode 🎧️⁠
⁠
Building a 2GW data centre takes a minimum of 12 to 18 months. ⁠
⁠
Supply chain issues across copper, cooling, construction, the whole thing is under stress right now. ⁠
⁠
Bloom Energy CEO KR Sridhar says they can have the power standing up faster than the data centre can even be built ⁠
⁠
#ai #datacenter #bloomenergy

## Stats

- **Views:** 2,911
- **Likes:** 130
- **Shares:** 0
- **Comments:** 16

## Credits

| Name | Username | Profile | Role |
| --- | --- | --- | --- |
| 20VC with Harry Stebbings | @20vc | https://gondola.cc/20vc | Podcast |

## Tags

bloomenergy, ai, datacenter

---
Copyright (c) Gondola