# @enquirer on Instagram

- **Type:** Video
- **Original URL:** https://www.instagram.com/p/DcjZ6ypFTst
- **Gondola URL:** https://gondola.cc/posts/69769509-enquirer-instagram
- **Thumbnail:** https://img.gondola.cc/tr:w-,h-,fo-auto/postThumbnails/c8fe93a404.jpg
- **Posted:** 2026-08-27T19:00:20.000+00:00
- **Account Owner:** Sam Greene (@sgdoesit) — https://gondola.cc/sgdoesit

## Caption

Demolition work on Downtown's historic Longworth Hall took six months. This video captures it in seconds.

Contractors took down about 200 feet from the east end of Longworth to make way for the newest bridge over the Ohio River.

Work on the bridge – located to the immediate west of the Brent Spence – officially began with a May 8 groundbreaking event.

📽️ Provided by Brent Spence Bridge Corridor #cincinnati #cincinnatiohio #bridge #nky

## Stats

- **Views:** 17,534
- **Likes:** 405
- **Shares:** 0
- **Comments:** 16

## Tags

cincinnati, nky, bridge, cincinnatiohio

---
Copyright (c) Gondola