facebook pixel
@pubity
😭 Transporting a single 70-meter wind turbine blade is a major logistical challenge that involves mounting it on a specially engineered trailer, planning the route months in advance, and coordinating convoy escorts such as police or pilot vehicles. Roads and even entire highways are sometimes temporarily shut down so the blade can safely navigate tight turns, bridges, and obstacles, making the process slow, precise, and carefully managed from start to finish. (šŸŽ„: @kalagin.nikita) #surprise

Ā 7.1m

Ā 84.2k

Ā 518

Ā 7.1m

Credits
    Tags, Events, and Projects
    • surprise