Alllllot of hours went into this thing from the time of Long Beach until now. If you’ve followed me since the beginning of this build then you know that time hasn’t always been on our side. The car was stripped down to virtually bare chassis and was reassembled with every nut and bolt gone through, every wire and connection checked, every AN/vacuum line checked, rerouted if needed, and torque sealed for confirmation, downpipe, dump tube and compressor housing have been ceramic coated, intercooler has been more effectively mounted, core support has been modified to be easier to be removed for engine service, rear subframe and diff have been gone through and sorted, coolant and fuel lines have been relocated to ease repairs of the subframe if damage occurs, interior modifications for driver comfort have been implemented, radio communications have been sorted, trailer and trailer organization have also been gone through as well. This isn’t everything we want to do and we will be adding mo...
Tags, Events, and Projects