This week the Frederickson ONE industrial park (building 5) had a massive stormwater installation. Typically larger stormwater areas require utilizing three to four smaller units, but the manufacturer designed a pour-in-place treatment vault that was custom-built and constructed on-site. The vault is the first of its kind!
#WaterTreatment #ProjectProgress