On Wadsworth Boulevard a parade of orange barrels marks a work zone that had just entered its fifth year of construction — with rearranged traffic patterns and business access cut-offs as crews laid new lanes and engineered burly intersections designed to shorten drivers’ time spent making turns.
The construction on the notorious chokepoint on metro Denver’s west side is easing up this month, Wheat Ridge officials say.
The work has added one new lane to Wadsworth in each direction (for a total of six across the roadway) and installed “continuous-flow intersections” at 38th and 44th avenues.
Read more at the link in our bio.
📝: John Aguilar, The Denver Post
📷: Hyoung Chang, The Denver Post // hyoung_ccc
#Colorado #WheatRidge #traffic #construction