facebook pixel
A house is a printing problem disguised as a building problem. Concrete extrusion for construction lives or dies on rheology. The mix must flow through a hose under pressure, then stop flowing the instant it leaves the nozzle. That contradiction has a name: thixotropy. The material shear-thins while moving and rebuilds internal structure at rest, gaining green strength in minutes rather than hours. Miss the window and the physics punishes you. - Too stiff, and the pump stalls or the bead tears - Too fluid, and the wall slumps under its own weight after eight or ten layers - Too slow between passes, and you build a cold joint with weak interlayer bond - Too fast, and the lower courses buckle before they can carry the load SQ4D and its ARCS platform have been solving this on permitted sites rather than in a lab. Credit where due to sq4dbuilds. The system is a gantry, not an arm. Rails give it an effectively infinite Y axis with an X span of sixteen to thirty feet, so the printer sca...

 10.3k

 294

 11

 10.3k

    Suggested Credits
    Tags, Events, and Projects